Tony sory for the lo res images but phone camera only until new works laptop is sorted.
the bracket is bolted to the two horisontal flats machined on the inlet casting. drilled and tapped to m8 if IIRC ( one of the lower tabs had to be adjusted out of the way ), will tidy it up once the testing sage is over.
Its a bit close to the act performance throttle body at the moment but further adjustment is planned. but mounted at the gearbox end, its the only place it would go in my install as the dizzie will be stopping until i can cut an old one down to drive the oil pump
let me know if you need anything further.
Ps are you planning to visit york Drag stip at any point ? planning a run in mine as part of a yearly run what you brung organised by locostbuilders group. especially if I can get those 8j rims with slicks fitted
regards